Book a Lift
An Alpha boom reaching from the street to the upper floors of a long glass facade, with flaggers below
0FT

Boom lift vs swing stage.
No roof rig. Reach over the roof.

A swing stage hangs from the roof, so it needs roof access, anchors and a clear drop. A truck-mounted lift works from the street, reaches over lower roofs and moves along the facade from one setup.

15 min to set up300 ft working height135 ft side reach1,322 lb 12 ft basketOperator includedPermits handled15 min to set up300 ft working height135 ft side reach1,322 lb 12 ft basketOperator includedPermits handled15 min to set up300 ft working height135 ft side reach1,322 lb 12 ft basketOperator includedPermits handled15 min to set up300 ft working height135 ft side reach1,322 lb 12 ft basketOperator includedPermits handled

The short answer, both ways.

Alpha boom lift

Pick the lift when

  • The shape of the roof, a fascia or cornices block a clean drop
  • There is no roof access, BMU or anchors, or a rig would cost too much for one job
  • The wall sits behind a lower roof or buildout
  • Inspections that move around the building in a day
  • Wind that makes hanging platforms sway
Swing stage

Pick a swing stage when

  • The building is taller than our 300 ft
  • The building has a BMU or davits and the work runs top to bottom for weeks
  • There is no street or yard space for a truck

Not sure? Send us the address and the job. We will tell you honestly if a lift is the wrong tool.

Side by side.

Alpha boom liftvsSwing stage
Where it sets up0roof rigs

At the curb or in the yard

Swing stage

On the roof: access, anchors and rigging

Next drop4sides in a day

The boom swings over, the truck rarely moves. The Wanamaker building: all 4 sides in one day

Swing stage

Re-rig from the roof for each drop

Over obstacles135ft sideways

Up to 135 ft sideways over lower roofs

Swing stage

Hangs straight down a clear wall

Wind27mph

The A-210 works in 27 mph winds. Rigid boom, level basket, no sway

Swing stage

Hangs on cables and can sway

People and tools1,322lb basket

12 ft basket, 1,322 lb, 5-6 people, power in the basket

Swing stage

Sized to the stage and its hoists

Who runs itIPAFoperator

Our certified operator, on site all day

Swing stage

Your crew, after rigging by a qualified team

Real jobs, real reasons.

Other comparisons.

Lift vs a swing stage questions, answered.

All questions →
Can a boom lift do a full facade inspection?

Yes. The basket moves along and around the building from the street. We inspected all four sides of the 223 ft Wanamaker building in Philadelphia in one day.

Do you need roof access?

No. The lift sets up at the curb or in the yard and reaches up and over. Nothing is rigged on the roof.

How tall a building can you reach?

Our lifts work up to 300 ft high. For taller buildings a swing stage or the building's own BMU is the right tool.

Does the basket sway in wind?

The basket sits on a rigid boom and stays level. Our lifts have a built-in wind meter, and the A-210 works in winds up to 27 mph with gusts to 36.

Book your lift. We handle the rest.

01Tell us the jobAddress, height, what you need to reach.
02We call you backThe right lift, the permits and a price.
03The lift arrivesOperator on site, basket up within 15 minutes.

Get a quote

Prefer to talk? 855-2000-855

How high do you need to work?

We use your information only to respond to this request.