Floating cranes, crane ships, piers and terminals. Our lifts go up to 300 ft with up to 135 ft of side reach and hold steady next to a moving vessel.
2hoursLights on a 328 ft craneBurned-out safety lights replaced along the boom of the Left Coast Lifter from a single parking spot, without lowering the crane.
$100Knot spentNo ground closureLowering the crane would have meant a large closed-off area, a major permit and a police detail: at least $100,000.
175ftEcho sounder below the dockOn short notice, a lift put engineers between the pier and a crane ship to install and test an echo sounder in a few hours.
Floating cranesLights replaced along the boom of a 1,750-ton crane barge.
Crane shipsEngineers worked below dock level, right alongside the hull.
Crane boomsThe basket followed the boom end to end, close but never touching.
Piers and terminalsParked on the pier and coned off, with one setup for the whole job.
Vessels in the waterOur operator adjusted for the ship's movement the whole time.Our operator keeps adjusting the basket to the small movements of a crane barge or ship in the water.
Up to 135 ft sideways. The A-250 covered the full length of a crane boom from one parking spot.
The 12 ft basket holds 1,322 lb: up to 6 people with their tools and the parts for the job.
We deploy day or night, usually on 72 hours' notice, and within 2 hours in an emergency.
A full-time IPAF and manufacturer certified operator runs the lift, so your crew can focus on the job.
24V, 110V and 220V in the basket, plus air and water lines and a hydraulic tool outlet.
Yes. The crane lowered its boom over our A-250, and our basket reached every light fixture along it. The crane never had to come down to the ground, so there was no ground closure.
Yes. Our operator continuously adjusts the basket to the small movements of a ship or crane barge in the water, staying close without touching it.
Yes. On a crane ship job our basket worked in the space between the pier and the hull, below the dock surface.
We deploy lifts day or night, usually on 72 hours' notice, and within 2 hours in an emergency. The crane ship job was done on short notice.
Up to 300 ft high and 135 ft sideways, or up to 100 ft up and over.
The 12 ft basket holds up to 1,322 lb: up to 6 people with tools and parts.