Scaffolding has to cover the whole facade before anyone works on it. A lift reaches the same wall from the street and leaves with the crew. Enter your facade and compare.
Rules: NYC DOB, permit for supported scaffolds over 40 ft; NYC Building Code 3314.4.5.1, 32-hour course for scaffold installers (40 ft and up); OSHA 29 CFR 1926.452(c)(6), engineer's design for frame scaffolds over 125 ft. The lift is picked by its factory working height. No prices included.
Washington National Cathedral.Pipe scaffolding meant drilling into historic natural stone. The lift secured the facade in 2 days, not the planned 3-5.
NYCHA smokestack.Pipe scaffolding would have taken weeks next to FDR Drive. The lift worked 26 stories up the tower.
Queens Supreme Courthouse.Pipe scaffolding anchored into the walls could damage the facade. The inspection was done from the basket, nothing touched the building.A supported scaffold over 40 ft needs a DOB permit before it goes up. If it stands on a sidewalk shed or other temporary equipment, that height counts too.
Workers who install, adjust or remove a supported scaffold 40 ft or taller, and the person supervising them, need a DOB-approved course of at least 32 hours (NYC Building Code 3314.4.5.1), with an 8-hour refresher every 4 years.
Under OSHA 29 CFR 1926.452(c)(6), frame scaffolds more than 125 ft above their base plates are designed by a registered professional engineer and built to that design.
Long work on one wall, with crews there every day for weeks, heavy material stored at height, or a facade taller than our 300 ft lift. Then scaffolding or a swing stage can make more sense.
No. Scaffold rental, erection and removal come from the scaffold contractor. For the lift, call 855-2000-855 with the address and the height.