- The job
A leading Brooklyn developer needed the trim of the 60 ft glass dome on top of the old Domino Sugar factory waterproofed and insulated. The crew had to reach 180-200 ft high and 50-60 ft in.
- The problem
Scaffolding did not suit the building's shape. Then a construction fence went up around the site, leaving only a narrow strip on one side to set up.
- What we sent
Our A-250, set up with the outriggers fully extended on one side and kept within the truck's width on the other. Our operator worked 5-10 inches from the glass.
- How it went
Two setups per facade, three elevations in seven days. When the construction hoist failed, we set a glass panel at 200 ft in 3 hours with our Power Lift system.