How the job went.
- The job
A nationwide sign company, a repeat client, had to remove a large sign near the roof of The Watermark at Logan Square, a 256 ft, 24-story building in downtown Philadelphia.
- The usual way
Manlifts don't reach that high, so the client would normally have used a crane and a swing stage for two electricians. The lift also had to fit in 25 ft between the tower and the garage next door.
- What we sent
Our A-250, with a full-time IPAF-certified operator. After a 15-minute setup on narrow Wood Street, two union workers started taking down the letters.
- How it went
The truck moved just once along the facade, and the whole sign came down. The job was done in half a day.












